This project proposed an addition to an existing chalet in Mill Valley. The addition was composed of a expanded open kitchen, double height dining space, and a remodeled living room.
After the Schematic Design phase was completed by the the initial architect, we took over the design development of this interior remodeling, eventually producing the Planning Review set, and the Permit Set.
For this existing home, the client asked us to design a number of different items: the living room, the family room, the staircase, and the front and back yards. In the backyard, we also designed a new, detached wine cellar.
This project provides 95% of all electrical power required by the 3 buildings on the site, totaling 120,000 SF. The geometry of the site requred us to design 6 different solar panel supporting structures, including an elegant solar tree. The solar tree utilizes the double HIT Sanyo panel which outputs 10 to 15% more power thanks to the ambient lighting captured on the back of the panel.
The following animation shows how the solar trees can be shipped flat, planted on site, and unfolded to receive the array of solar panels. This project was developed to the SD phase, as an important waterfront development in Sausalito. It features a storage building, an industrial two story building with roll-up doors for the shops on the ground floor; and an elegant office component at the most visible portion of the site, the tip toward the marina. This building also provides a plaza with restaurant / cafe' open to the general public.
This waterfront development included industrial, storage and office components. A wood boat construction school was also to be preserved in the program, as an existing artisanship center linked to the history of the place. The site occupies half of the historic shipyard which built all the Liberty ships during WWII.
|
projects by tags:
All
projects by date:
October 2022
|