The portions of the building facing the public roadways represent the web, with its chaos and vulnerabilities: the braced, irregular, glazed facade is built at the minimum allowed setback on the South and East edges of the site, and it contains the office spaces with the executive penthouse on the top floor. Glare is reduced using darkened glass, while on the south there are also louvers. The green roof helps cooling the building during the hot periods of the year.
On the west side, a massive, double walled mechanical concrete "Spine" functions has a figurative protection for the courtyard and the rest of the site, occupied by other existing buildings of the same company. The "Spine" holds most of the mechanical and service elements of the building, and on the West side its dark color and uniform large surface absorbs the sun radiations and prevents the office spaces from overheating. Additional heat exchange can be achieved by running water systems within the large concrete mass. Two separate blocks are cladded in solar panels and provide opportunity for separate elements of the program: on the South, the Executive Briefing Center, while on the North the underground Service yard, and the Amenity area. The Solar Orchard lays in the inner court, and provides additional renewable power production, while its pool provides freshness and moisture to the communal amenity space. |
projects by tags:
All
projects by date:
October 2022
|