This project will redevelop the triangular site with a 40-foot high three-story commercial office building of 109,375 square feet with a two-level underground parking garage of 75,653 square feet. In addition, the project will complete the existing bridge crossing with the construction of a 64-foot-wide bridge over the drainage channel. The bridge will provide access to the building's main entrance and include a publicly accessible park space of 10,000 square feet. The project would also include an onsite stacked shipping container cafe.
I was asked to develop the CD set, while working directly on the production of several drawings, including: egress plans, enlarged plans and elevations, wall sections, roof details, etc. While on the project, I have also produced some design studies for the corner glazed staircase.
These are studies for the suspended steel staircase construction and design, at the South-East glazed corner of the building:
The following animation was produced using a Dynamo script which I created in order to animate Revit section boxes. The animations were used to analyze the model and identify trouble areas and clashes throughout the model.
For this 73,000 GSF Communal Living project in Los Angeles I created and rendered some quick design studies for the main elevations. The building uses cross-laminated timber (CLT) as structural technology, and exposing the wood structural elements was one of the goal of the design.
|