The Mule Creek Infill Complex Project is a design-build, stipulated sum project with a contract value of approximately $330 million. The California Department of Corrections and Rehabilitation (CDCR) project includes 544,000 SF of new construction, spread across 23 individual buildings. The scope of work, adjacent to the active, high-security Mule Creek State Prison, includes the mass excavation of over 1,000,000 cubic yards of material, all new site utilities and systems to support the new complex and over one mile of lethal electrified fencing.
For this project I have first participated in the Competition and then I was in the team that developed the project from DD through 100% CD. I was the BIM manager for the HOK office. I have also produced some renderings for marketing purposes. For this 275,000 SF, $165 million San Mateo County jail, I revised the CD set of drawings, particularly all exterior elevations sheets; I have also remodeled and documented the roofs.
For this high-rise building I have helped with the Bulletin #4, issued for the street lobby. In particular, I have remodeled and documented the elevator alcoves with their wood and stone paneling. I have also revised the RCP and other Revit drawings.
|
projects by tags:
All
projects by date:
June 2020
|