This was my first assignment at Fuksas. This large commercial Centre and amusement park also included a 50 rooms Hotel, with amenity podium, and a separate Auditorium. I have been modeling and then directing the modeling of all components of the project (Auditorium, Park, Mall, and Hotel), when the client put the project on hold.
This project included the addition of 3 stories to the existing concrete frame garage. The planning officials at the City of San Jose required the elevation on Winchester Blvd. to be "broken" down and varied, both in heights, colors and materials. Therefore I had to reconsider the original design that we developed to win this project, a sleek metal mesh wrapping the concrete frame. Ultimately, the metal mesh was replaced by a more colorful and differentiated set of elements. EIFS panels, a long fiberglass cornice, metal louvers, and glazed "shopping" windows provided the requested playfulnes and variation. The project was modeled and documented in Revit, and I followed it through CA.
This 242,317 Sq.Ft. leasable area addition project includes the expansion of Macy's, JCPenney, and Sears, space for 100 new stores, 2 parking garages, a new 50% bigger dining terrace consisting of 820 seats, relocation of Crate & Barrel, and numerous changes to the Promenade. In particular, a new and enhanced indoor shopping promenade was designed, completed with three major spatial nodes: the South node, the new Main Entry space, and the North node. I have been involved since schematic design thru 100% Construction Documents. In the early phase of design, I developed a Revit model whose exports made up for over 75% of the entire pricing set for the project. Later, during design development and CD phases, I focused on the main entry node, with its glazed moment frame toward the exterior plaza, the large canopy, and the pedestrian bridge at the second level.
This project explores different options for the remodeling and conversion into a domestic terminal of the San Francisco Internation Airport Terminal 2, formerly the international terminal, closed in 2000. Several schematic designs were developed, paying attention to the deficiencies of the current building, and the ever-changing needs of a new domestic terminal. The study proposes increasing levels of intervention, from a simple remodeling of the existing building to its almost complete demolition and replacement. In all schemes, Boarding Area D is mostly preserved since its current design already serves efficiently the highest number of gates possible.
I was one of the designers in the team, and below are shown my contributions to the final proposal. |
projects by tags:
All
projects by date:
October 2022
|