Giovanni Succi Website
  • HOME
  • PORTFOLIO
    • PROJECTS
    • VISUALIZATIONS
    • OTHER 3D
    • PHOTOGRAPHY
  • RESUME
    • FULL RESUME
  • REVIT BLOG


Projects

Centre Commercial, Oran, Algerie [While at Fuksas]

11/14/2016

 
This was my first assignment at Fuksas. This large commercial Centre and amusement park also included a 50 rooms Hotel, with amenity podium, and a separate Auditorium. I have been modeling and then directing the modeling of all components of the project (Auditorium, Park, Mall, and Hotel), when the client put the project on hold. 

Richardson Concourse Renovation, Winnipeg, MB [While at Stantec]

2/25/2010

 
These renderings were produced for the interior remodeling of an existing mall.

Santana Row Parking Garage, San Jose, CA [While at Stantec]

6/23/2009

 
This project included the addition of 3 stories to the existing concrete frame garage. The planning officials at the City of San Jose required the elevation on Winchester Blvd. to be "broken" down and varied, both in heights, colors and materials. Therefore I had to reconsider the original design that we developed to win this project, a sleek metal mesh wrapping the concrete frame. Ultimately, the metal mesh was replaced by a more colorful and differentiated set of elements. EIFS panels, a long fiberglass cornice, metal louvers, and glazed "shopping" windows provided the requested playfulnes and variation. The project was modeled and documented in Revit, and I followed it through CA.

Westfield Galleria at Roseville, CA [While at Gensler]

6/22/2006

 
This 242,317 Sq.Ft. leasable area addition project includes the expansion of Macy's, JCPenney, and Sears, space for 100 new stores, 2 parking garages, a new 50% bigger dining terrace consisting of 820 seats, relocation of Crate & Barrel, and numerous changes to the Promenade. In particular, a new and enhanced indoor shopping promenade was designed, completed with three major spatial nodes: the South node, the new Main Entry space, and the North node. I have been involved since schematic design thru 100% Construction Documents. In the early phase of design, I developed a Revit model whose exports made up for over 75% of the entire pricing set for the project. Later, during design development and CD phases, I focused on the main entry node, with its glazed moment frame toward the exterior plaza, the large canopy, and the pedestrian bridge at the second level.

San Francisco Int'l Airport, Terminal 2 remodel [While at Gensler]

12/12/2005

 
This project explores different options for the remodeling and conversion into a domestic terminal of the San Francisco Internation Airport Terminal 2, formerly the international terminal, closed in 2000. Several schematic designs were developed, paying attention to the deficiencies of the current building, and the ever-changing needs of a new domestic terminal. The study proposes increasing levels of intervention, from a simple remodeling of the existing building to its almost complete demolition and replacement. In all schemes, Boarding Area D is mostly preserved since its current design already serves efficiently the highest number of gates possible.
I was one of the designers in the team, and below are shown my contributions to the final proposal.

    projects by tags:

    All
    Built
    Green
    Revit
    Role: Animation
    Role: BIM Lead
    Role: Concept Design
    Role: Constr. Admin.
    Role: Constr. Documents
    Role: Design Developm.
    Role: Photography
    Role: Schematic Design
    Role: Visualization
    Type: Civic
    Type: Commercial
    Type: Corporate
    Type: Healthcare
    Type: High Rise
    Type: Hospitality
    Type: Interior
    Type: Justice
    Type: Master Plan
    Type: Public
    Type: Residential
    Type: Retail
    Type: School K-12
    Type: Transportation
    While At: Brick
    While At: Chong Partners
    While At: Consulting
    While At: Fuksas
    While At: Gensler
    While At: GS Design
    While At: Heller Manus
    While At: HOK
    While At: Perkins&Will
    While At: School
    While At: Shah Kawasaki
    While At: Smithgroup
    While At: Stantec
    While At: StewartΣSucci

    projects by date:

    October 2022
    June 2020
    August 2019
    December 2018
    November 2018
    October 2018
    August 2018
    July 2018
    June 2018
    January 2018
    May 2017
    March 2017
    February 2017
    November 2016
    May 2016
    February 2016
    January 2016
    February 2015
    September 2014
    December 2013
    November 2013
    September 2013
    June 2013
    July 2012
    October 2011
    September 2011
    July 2011
    June 2011
    March 2011
    November 2010
    August 2010
    March 2010
    February 2010
    November 2009
    August 2009
    June 2009
    February 2009
    December 2008
    September 2008
    June 2008
    December 2007
    November 2007
    September 2007
    June 2007
    May 2007
    March 2007
    June 2006
    February 2006
    January 2006
    December 2005
    July 2005
    June 2005
    April 2005
    April 2004
    February 2004
    November 2003
    January 2003
    December 2002
    September 2001
    February 2001
    March 2000
    July 1999


    RSS Feed

Proudly powered by Weebly
  • HOME
  • PORTFOLIO
    • PROJECTS
    • VISUALIZATIONS
    • OTHER 3D
    • PHOTOGRAPHY
  • RESUME
    • FULL RESUME
  • REVIT BLOG