Giovanni Succi Website
  • HOME
  • PORTFOLIO
    • PROJECTS
    • VISUALIZATIONS
    • OTHER 3D
    • PHOTOGRAPHY
  • RESUME
    • FULL RESUME
  • REVIT BLOG


Projects

Centre Commercial, Oran, Algerie [While at Fuksas]

11/14/2016

 
This was my first assignment at Fuksas. This large commercial Centre and amusement park also included a 50 rooms Hotel, with amenity podium, and a separate Auditorium. I have been modeling and then directing the modeling of all components of the project (Auditorium, Park, Mall, and Hotel), when the client put the project on hold. 

Edmonton Oilers Arena, Northlands, Edmonton [While at Stantec]

8/12/2009

 
After I was involved in the late master plan design and visualization for a proposed new Oilers arena, while at Stantec, I decided to pursue my original concept of the "swirling" open plaza (from the north) and green park (from the south) that generate the geometry of the arena itself, at their intersection. The arena has two concrete, organic wings: one perforated to become a large truss, to the north and east; and one more solid, to the south and west. The perforated, glazed wing allows both for a visual connection with the large plaza to the north, and northern light to flood the circulation galleria within it.

Libertyship Way II, Sausalito, CA [With Charles M. Stewart]

6/11/2008

 
This project was developed to the SD phase, as an important waterfront development in Sausalito. It features a storage building, an industrial two story building with roll-up doors for the shops on the ground floor; and an elegant office component at the most visible portion of the site, the tip toward the marina. This building also provides a plaza with restaurant / cafe' open to the general public.

Parco delle Rimembranze, Toirano, Italy [While at GS Design]

11/14/2007

 
Toirano is a medieval borgo laying in the hillside of the northern-Italian Liguria region, 3 kilometers from the sea. I was asked by the major to design a feature that would improve the presence of the borgo from the provincial street, which connects it to the rest of the region. Located on the provincial street itself, only a couple of blocks from the entry to the borgo, this open, public plaza wants to slow potential tourists and redirect them toward the borgo. A short circular wall, at the end of a pedestrian amphitheater, offers a prime location for a stainless steel sign reading the name of the borgo. At the same time, the plaza respects and preserves the trees planted here at the end of WWII as commemoration of the citizens fallen in the conflict. Having visited the borgo several times, I paid special attention to the materials currently in use in the existing historical buildings as well as the new ones. The original design called for split face local stones, cobble stones, wood, and a shallow pool of water.

Alameda Point Master Plan [While at Chong Partners]

6/6/2007

 
For this proposal of a large re-development of the San Francisco East bay, I developed a fully "intelligent" BIM model, including custom Mass families and schedules.

California Academy of the Arts, Sacramento, CA [While at Chong Partners]

3/12/2007

 
California Academy of the Arts is a unique partnership of professional theater companies and primary and secondary educational facilities on an urban site, geared toward providing theater patrons with unparalleled experiences, and allowing students the opportunity to learn along side professional actors and crew. The complex comprises four theater venues: 1500 seat theater, 600 seat theater, 200 seat flexible use theater, and 100 seat flexible use theater. Educational and rehearsal space for the visual and performing arts is directly adjacent to the theater complex – facilitating an integrated learning experience for primary/secondary students, as well as BFA candidates.
The California Academy of the Arts forms the centerpiece for the new public piazza in the Rail-yards, developed by Thomas Enterprises in Sacramento, California. Full production facilities to support the theaters are also on site. The complex envisions planted outdoor roof gardens for use before and after theatrical events, or for private and public events. The project has been envisioned by many of the major arts groups in the region, including Sacramento Theater Company, California Musical Theater, Sacramento Ballet, Capitol Stage, Sacramento Choral Society, Sacramento Philharmonic, among others.

Arques Shipyard, Sausalito, CA [With Charles M. Stewart]

7/10/2005

 
This waterfront development included industrial, storage and office components. A wood boat construction school was also to be preserved in the program, as an existing artisanship center linked to the history of the place. The site occupies half of the historic shipyard which built all the Liberty ships during WWII.

Biotechnology Company Headquarters Master Plan [While at Gensler]

6/3/2005

 
This was a relatively fast master planning exercise, where I rendered the site plans and the perspectives from the same 3D Studio MAX scene. Several options for office, lab and parking expansion were analyzed and proposed.

Microsoft Redmond Campus Master Plan [While at Gensler]

4/1/2005

 
This master plan explored the addition of 3M square foot of new office space to the existing campus, including the required parking, and public open spaces. Several concept design schemes were produced and presented.

Genentec South San Francisco Campus Master Plan [While at Gensler]

4/1/2004

 
These are options for the Hilltop site of the Genentech South San Francisco campus. Also, we developed the graphics for a general campus site plan.

New York Ground Zero [While at GS Design]

1/26/2003

 
This is my proposal for rebuilding New-York Ground Zero. I also produced the animation below.

Salesian High School Master Plan, Richmond, CA [While at Chong Partners]

2/13/2001

 
The Salesians retained Chong Partners to complete an extensive master plan of their aging campus. After determining the goals and the needs of the school, and after analyzing the shortcomings of the existing infrastructures, we proposed several interventions, including additional buildings and extensive remodeling of the existing structures.  The aim was to meet current code and requirements. Finally, I produced a comprehensive video highlighting the master plan features to help the Salesians marketing team in their found rising efforts.

Bayshore Community Center Competition, San Francisco, CA [While at Chong Partners]

3/13/2000

 

    projects by tags:

    All
    Built
    Green
    Revit
    Role: Animation
    Role: BIM Lead
    Role: Concept Design
    Role: Constr. Admin.
    Role: Constr. Documents
    Role: Design Developm.
    Role: Photography
    Role: Schematic Design
    Role: Visualization
    Type: Civic
    Type: Commercial
    Type: Corporate
    Type: Healthcare
    Type: High Rise
    Type: Hospitality
    Type: Interior
    Type: Justice
    Type: Master Plan
    Type: Public
    Type: Residential
    Type: Retail
    Type: School K-12
    Type: Transportation
    While At: Brick
    While At: Chong Partners
    While At: Consulting
    While At: Fuksas
    While At: Gensler
    While At: GS Design
    While At: Heller Manus
    While At: HOK
    While At: Perkins&Will
    While At: School
    While At: Shah Kawasaki
    While At: Smithgroup
    While At: Stantec
    While At: StewartΣSucci

    projects by date:

    June 2020
    August 2019
    December 2018
    November 2018
    October 2018
    August 2018
    July 2018
    June 2018
    January 2018
    May 2017
    March 2017
    February 2017
    November 2016
    May 2016
    February 2016
    January 2016
    February 2015
    September 2014
    December 2013
    November 2013
    September 2013
    June 2013
    July 2012
    October 2011
    September 2011
    July 2011
    June 2011
    March 2011
    November 2010
    August 2010
    March 2010
    February 2010
    November 2009
    August 2009
    June 2009
    February 2009
    December 2008
    September 2008
    June 2008
    December 2007
    November 2007
    September 2007
    June 2007
    May 2007
    March 2007
    June 2006
    February 2006
    January 2006
    December 2005
    July 2005
    June 2005
    April 2005
    April 2004
    February 2004
    November 2003
    January 2003
    December 2002
    September 2001
    February 2001
    March 2000
    July 1999


    RSS Feed

Powered by Create your own unique website with customizable templates.
  • HOME
  • PORTFOLIO
    • PROJECTS
    • VISUALIZATIONS
    • OTHER 3D
    • PHOTOGRAPHY
  • RESUME
    • FULL RESUME
  • REVIT BLOG