Giovanni Succi Website
  • HOME
  • PORTFOLIO
    • PROJECTS
    • VISUALIZATIONS
    • OTHER 3D
    • PHOTOGRAPHY
  • RESUME
    • FULL RESUME
  • REVIT BLOG


projects

Starcity Santa Monica, CA [While at Brick]

12/3/2018

 
For this 73,000 GSF Communal Living project in Los Angeles I created and rendered some quick design studies for the main elevations.  The building uses cross-laminated timber (CLT) as structural technology, and exposing the wood structural elements was one of the goal of the design.

Trinity Place IV Lobby 100%DD, San Francisco, CA [While Consulting]

1/17/2018

 
I was hired to create the Revit model for this lobby interiors, by BAMO, and to produce the 100%DD set. The given material was a SketchUp model and a Schematic PDF presentation.

Learown Fuda Square, Shenzhen, China [While at Fuksas]

2/15/2017

 
These are studies I produced for the hotel portion of a larger commercial development.  After some initial options, the designed focused on the hexagonal pods motives, which echoed the 3D hexagonal design of the storefronts, already proposed to the client.

Centre Commercial, Oran, Algerie [While at Fuksas]

11/14/2016

 
This was my first assignment at Fuksas. This large commercial Centre and amusement park also included a 50 rooms Hotel, with amenity podium, and a separate Auditorium. I have been modeling and then directing the modeling of all components of the project (Auditorium, Park, Mall, and Hotel), when the client put the project on hold. 

Oceanwide Center, San Francisco, CA [While at Heller Manus, with Foster+Partners]

1/24/2016

 
A $1.3BL mixed use project in the SOMA district of San Francisco, the two million square foot development comprises two high-rise towers, along with impressive new public spaces and important new pedestrian links through downtown. Together, the buildings provide 1.35 million square feet of office space and 650,000 square feet of residential units.
As BIM coordinator for the Heller Manus team, I have been working on the SD documents for the project's four level basement.
​In particular, I was involved with the 3D modeling of the garage, the parking, and the distribution of the dense program for the hotel and residentail component of the towers above (Locker rooms, bike storage room, hotel programs such as laundry and admin offices, etc.).

The Panoramic - 1321 Mission St., San Francisco, CA [While Consulting]

10/4/2011

 
For this 108,000 SF, 120 FT tall, 11 stories, high-rise residential building I have provided BIM modeling and visualization services. Starting from a Sketchup model and DWG backgrounds, I have created and rendered the model in Revit (shell only).

Sharp Grossmont ADA rooms, San Diego, CA [While at Stantec]

12/9/2008

 
This was a visualization task, for the remodeling of hospital rooms.

Dominican Hospital, Santa Cruz, CA [While at Chong Partners]

12/27/2007

 
For this hospital remodel, I was asked to render the lobby and cafeteria. After construction was completed, the photographer took images from the same angles as the renderings.

San Francisco General Hospital, Entry Pavillion [While at Chong Partners]

5/11/2007

 
This project was part of a competition’s entry for SFGH master plan, in partnership with SmithGroup, San Francisco office. After a preliminary team space planning, I began the design of the entry pavillion, to be nested between the brutalist modern hospital to the East, the new replacement tower (unbuilt) to the West, and the neo-romanesque, red brick and terracotta building to the South-West. For the competition, most effort was spent on the main waiting lobby and the front desk areas, which were to provide a welcoming entry point from two distinct directions: South (from the garage and vehicular drop-off) and West (the pedestrian entry from Potrero Ave.).
After the submission of the competition I focused on the design of the entry pavillion. With its dramatic double height slanted glazed wall, this space provides an ample seating area, a cafe’, a corner for a large art piece, and the West entrance to the hospital. Below the interior glazing of the community room on the second floor, a dropped cloud ceiling helps to define the circulation toward the front desk. Materials include exposed aggregate sand blasted concrete for the columns, glossy two-colors terrazzo for the pavements, wood veneer paneling for the custom cabinetry, painted steel cable bracings and tube columns for the curtain wall, and horizontal terracotta tiles for accent walls.

Westfield Galleria at Roseville, CA [While at Gensler]

6/22/2006

 
This 242,317 Sq.Ft. leasable area addition project includes the expansion of Macy's, JCPenney, and Sears, space for 100 new stores, 2 parking garages, a new 50% bigger dining terrace consisting of 820 seats, relocation of Crate & Barrel, and numerous changes to the Promenade. In particular, a new and enhanced indoor shopping promenade was designed, completed with three major spatial nodes: the South node, the new Main Entry space, and the North node. I have been involved since schematic design thru 100% Construction Documents. In the early phase of design, I developed a Revit model whose exports made up for over 75% of the entire pricing set for the project. Later, during design development and CD phases, I focused on the main entry node, with its glazed moment frame toward the exterior plaza, the large canopy, and the pedestrian bridge at the second level.

Three PNC Plaza, Pittsburgh [While at Gensler]

2/15/2006

 
750,000 Sq.Ft. - $179M - I have been involved during Design Development for this mixed use high-rise building, supporting the senior designer in the development, selection and visualization of the final scheme.

    projects by tags:

    All
    Built
    Green
    Revit
    Role: Animation
    Role: BIM Lead
    Role: Concept Design
    Role: Constr. Admin.
    Role: Constr. Documents
    Role: Design Developm.
    Role: Photography
    Role: Schematic Design
    Role: Visualization
    Type: Civic
    Type: Commercial
    Type: Corporate
    Type: Healthcare
    Type: High Rise
    Type: Hospitality
    Type: Interior
    Type: Justice
    Type: Master Plan
    Type: Public
    Type: Residential
    Type: Retail
    Type: School K-12
    Type: Transportation
    While At: Brick
    While At: Chong Partners
    While At: Consulting
    While At: Fuksas
    While At: Gensler
    While At: GS Design
    While At: Heller Manus
    While At: HOK
    While At: Perkins&Will
    While At: School
    While At: Shah Kawasaki
    While At: Smithgroup
    While At: Stantec
    While At: StewartΣSucci

    projects by date:

    June 2020
    August 2019
    December 2018
    November 2018
    October 2018
    August 2018
    July 2018
    June 2018
    January 2018
    May 2017
    March 2017
    February 2017
    November 2016
    May 2016
    February 2016
    January 2016
    February 2015
    September 2014
    December 2013
    November 2013
    September 2013
    June 2013
    July 2012
    October 2011
    September 2011
    July 2011
    June 2011
    March 2011
    November 2010
    August 2010
    March 2010
    February 2010
    November 2009
    August 2009
    June 2009
    February 2009
    December 2008
    September 2008
    June 2008
    December 2007
    November 2007
    September 2007
    June 2007
    May 2007
    March 2007
    June 2006
    February 2006
    January 2006
    December 2005
    July 2005
    June 2005
    April 2005
    April 2004
    February 2004
    November 2003
    January 2003
    December 2002
    September 2001
    February 2001
    March 2000
    July 1999


    RSS Feed

Powered by Create your own unique website with customizable templates.
  • HOME
  • PORTFOLIO
    • PROJECTS
    • VISUALIZATIONS
    • OTHER 3D
    • PHOTOGRAPHY
  • RESUME
    • FULL RESUME
  • REVIT BLOG