For this high-rise building I have helped with the Bulletin #4, issued for the street lobby. In particular, I have remodeled and documented the elevator alcoves with their wood and stone paneling. I have also revised the RCP and other Revit drawings.
I was hired by Shah Kawasaki to work with the Construction Administration team for this large hospital project. One of the major tasks of the team involved the production and delivery of ACDs (Amended Construction Drawings). Some sheets for ACD 033 follows in the gallery below.
This project proposed an addition to an existing chalet in Mill Valley. The addition was composed of a expanded open kitchen, double height dining space, and a remodeled living room.
For this 108,000 SF, 120 FT tall, 11 stories, high-rise residential building I have provided BIM modeling and visualization services. Starting from a Sketchup model and DWG backgrounds, I have created and rendered the model in Revit (shell only).
For this 100% DD set submittal I have been producing the Fire Life Safety Plans, together with the Gallery's plans, RCPs, and Sections. The existing portions of the building are shown hatched.
For this CD submittal I focused on the Gallery's seismic joints covers, between the ACT and the K Building. I developed the Revit families designed to represent both the interior and exterior joint covers, which were then detailed and scheduled.
After the Schematic Design phase was completed by the the initial architect, we took over the design development of this interior remodeling, eventually producing the Planning Review set, and the Permit Set.
This complex is over 550,000 square feet, has a contract value of $497 million, and includes courthouses, ballistic ranges, laboratories, and a number of other functions. My role for this project was project architect, with a secondary Revit support task. During the DD phase I have been assigned to the sheets representing the stairs and elevators enlarged plans and sections. Later, I was assigned to the door schedule and plan check for all door and screens in the Laboratory block of the building. I worked closely with a senior technical architect, in San Francisco, while we coordinated with a BIM management team located in Philadelphia. The rest of the team was located in Sacramento, and Toronto.
For this existing home, the client asked us to design a number of different items: the living room, the family room, the staircase, and the front and back yards. In the backyard, we also designed a new, detached wine cellar.
This project provides 95% of all electrical power required by the 3 buildings on the site, totaling 120,000 SF. The geometry of the site requred us to design 6 different solar panel supporting structures, including an elegant solar tree. The solar tree utilizes the double HIT Sanyo panel which outputs 10 to 15% more power thanks to the ambient lighting captured on the back of the panel.
The following animation shows how the solar trees can be shipped flat, planted on site, and unfolded to receive the array of solar panels. A few years back, Chong Partners designed the community center for an indian Nation, in northern California. The Tribal Council Chambers were added to the north of the site, adjacent to the school building. The relationship with the gathering hall building, the ellipse in the center of the existing composition, has been a major design factor for the council chambers. After we proposed a few massing studies, the client selected a "regular", hortogonal design which fits the contextual buildings and does not compete with the existing elliptical hall. Solar panels, hydronic slabs, and motorized operable glazing and shades, are all part of the sustainable features which make this a zero energy building. The building was designed and documented mostly in Revit. I have been the Project Architect from schematic design through 50% CDs.
I was hired by VBN Architects to model and render this building, desinged by Peter Pfau. For a few weeks, therefore, I have been working closely with the architect and the project team and developed the Revit model of the building. These are the final images rendered in 3D Studio MAX, together with some photograph of the built building, by Juli Abbott.
After I was involved in the late master plan design and visualization for a proposed new Oilers arena, while at Stantec, I decided to pursue my original concept of the "swirling" open plaza (from the north) and green park (from the south) that generate the geometry of the arena itself, at their intersection. The arena has two concrete, organic wings: one perforated to become a large truss, to the north and east; and one more solid, to the south and west. The perforated, glazed wing allows both for a visual connection with the large plaza to the north, and northern light to flood the circulation galleria within it.
This project included the addition of 3 stories to the existing concrete frame garage. The planning officials at the City of San Jose required the elevation on Winchester Blvd. to be "broken" down and varied, both in heights, colors and materials. Therefore I had to reconsider the original design that we developed to win this project, a sleek metal mesh wrapping the concrete frame. Ultimately, the metal mesh was replaced by a more colorful and differentiated set of elements. EIFS panels, a long fiberglass cornice, metal louvers, and glazed "shopping" windows provided the requested playfulnes and variation. The project was modeled and documented in Revit, and I followed it through CA.
For this TI project I supported the production of Revit documents for the architectural team. I was then asked to create graphics that would emphasize the multidisciplinary nature of the Stantec team, which encompassed architecture and MEP components. The resulting image is a diagramatic rendering of the architectural and mechanical Revit model which was produced for the delivery of the project.
I was placed on this project mainly as Revit team support leader, but then I took on the design and documentation of the board room, which was never built.
The Chong Partners Sacramento office proposed this project for the Performing Arts Center and School, together with residential and commercial components. The redevelopment site is the old Sacramento Railroad yard with its brick and steel historic industrial buildings. After the initial master planning, Chong Partners developed a schematic design for the Performing Arts Center, which included a 1600 seats theater. I participated in the schematic design of the whole site, but then focused on the theater and plaza, further developing the facade, the lobby/foyer, and their relationship with the adjacent public space.
This project was developed to the SD phase, as an important waterfront development in Sausalito. It features a storage building, an industrial two story building with roll-up doors for the shops on the ground floor; and an elegant office component at the most visible portion of the site, the tip toward the marina. This building also provides a plaza with restaurant / cafe' open to the general public.
For this hospital remodel, I was asked to render the lobby and cafeteria. After construction was completed, the photographer took images from the same angles as the renderings.
Toirano is a medieval borgo laying in the hillside of the northern-Italian Liguria region, 3 kilometers from the sea. I was asked by the major to design a feature that would improve the presence of the borgo from the provincial street, which connects it to the rest of the region. Located on the provincial street itself, only a couple of blocks from the entry to the borgo, this open, public plaza wants to slow potential tourists and redirect them toward the borgo. A short circular wall, at the end of a pedestrian amphitheater, offers a prime location for a stainless steel sign reading the name of the borgo. At the same time, the plaza respects and preserves the trees planted here at the end of WWII as commemoration of the citizens fallen in the conflict. Having visited the borgo several times, I paid special attention to the materials currently in use in the existing historical buildings as well as the new ones. The original design called for split face local stones, cobble stones, wood, and a shallow pool of water.
|
projects by tags:
All
projects by date:
October 2022
|